Information about companies exporting in Republic of Belarus: message board, products and services.
Main menue
Archives
Advertisements
News Basic requirements for the design of piping systems, central vacuum Vacuflo
1. Vertical section of the pipeline on which the rubbish and the dust is transported upwards, should not exceed 3 meters. In cases where dirt and dust must be raised higher than one floor, in the horizontal plane between floors pipe length should not be less than 2.4 meters 2. Connect the vertical segment of the pipeline to the horizontal main line is produced, either from above or from the side). 3. Tee (code 5515) should be used only in the horizontal plane; possible use other tees 4. All powertrains Vacuflo - single-phase, three-wire cable equipped for connection to a grounded electrical outlet that is installed within 1 meter of the installation location of the power unit. To power outlet should be positioned at the wire section of 2.5 square directly from the switchboard. 5. In order to maintain system stabilizer is recommended to provide for the installation of electric voltage. 6. The exhaust pipe length should not exceed 9 meters, taking into account losses in the bends. Back to "All news" | Print version 27.03.2024Food safety Testing of food and agricultural products 26.03.2024Cambridge Teaching Method 26.03.2024UE «Vitebskoblgas» PD «Vitebsktorf» The Republic of Belarus 25.03.2024Lesdrevconsult LLC is a dynamically developing company We are the official distributor of FARMERTEC and HOLZFFORMA products in the EAEU. Gasoline tools and spare parts for them. 25.03.2024Order the production of labels in Art-Druk LLC Order the production of labels in Art-Druk LLC Info centerAbout UsFAQ / HelpPartnersContactsBusiness NewsPress ReleasesTrade ShowsLegal informationServices
"Business-Inform" Ltd. All rights reserved. Using these sources you agree to our Terms and Conditions
|